Nuclear Fusion
ISSN 0029-5515
2026
Shared — curated by The Gufo editorial team

Design scoping and systems modelling of ST-E1 using the PyTok power plant simulation code

Tokamak Energy

Received: 2026-11-01 · Published: 2026-07-10

Curated by The Gufo editorial team.

Originally published in Nuclear Fusion, 2026 — https://doi.org/10.1088/1741-4326/ae5d55.

Original title
Design scoping and systems modelling of ST-E1 using the PyTok power plant simulation code
Authors
C.L. Wilson, J. Astbury, M.J. Ginsberg, N. Hinton, E.N.J. Maartensson, S.A.M. McNamara, J. Willis, E. Yildirim, the ST-E1 Team
Source journal
Nuclear Fusion
Published
2026-07-10
Licence
Creative Commons Attribution 4.0 International
Original
https://doi.org/10.1088/1741-4326/ae5d55

Authors and publishers can request removal at any time via Copyright infringement; we act within 48 hours.

Abstract

Abstract To support the pre-concept design of Tokamak Energy’s (TEs) ST-E1 fusion power plant, we developed a new systems code, PyTok. PyTok codifies plasma physics and engineering constraints within a pure Python, object-oriented framework designed for rapid design iteration and exploration of the power-plant parameter space. The code base and its human- and machine-readable data structures enable coupling to external physics codes and data-analysis tools. Informed by TEs design philosophy and techno-economic analyses, the code was used to identify an initial reference design point for ST-E1. A commercially competitive fusion power plant is achievable with a tokamak power core of major radius 5.0 m, aspect ratio 1.9 ⩽ A ⩽ 2.3 and toroidal field 3.25 ⩽ B T ⩽ 5.25 T. The selected design point serves both as a pilot plant and as a commercially competitive reactor using the same permanent power core hardware, enabled by an in-vessel component upgrade phase. The commercial phase targets steady-state operation and a normalised capital expenditure of $12 000–15 000 per kW e , corresponding to a fusion power of 2.0–2.5 GW and a net electric power of 800–1000 MW.

1 / ? 100% Open in new tab Download Cite

Loading the full text…

Summary

Tokamak Energy is developing ST-E1, a spherical tokamak fusion power plant, and to support its early design phase the company built a new software tool called PyTok. This systems code combines plasma physics and engineering rules within a flexible, Python-based framework that allows engineers to quickly iterate through different design options and explore how changing parameters affects overall plant performance. Because its data structures are both human- and machine-readable, PyTok can also be linked to other physics simulation codes and data-analysis tools, making it a flexible hub for design work.

Using PyTok, guided by Tokamak Energy's design philosophy and economic analyses, the team identified an initial reference design for ST-E1: a tokamak with a major radius of 5.0 metres, an aspect ratio between 1.9 and 2.3, and a toroidal magnetic field between 3.25 and 5.25 tesla. This design is intended to serve two roles with the same core hardware: first as a pilot plant, and later—after an upgrade to its in-vessel components—as a commercially competitive power plant. In its commercial phase, the plant is designed to run continuously (steady-state) and aims for a capital cost of $12,000-15,000 per kilowatt of electricity, producing 2.0-2.5 gigawatts of fusion power and delivering 800-1000 megawatts of net electricity to the grid.

Plain-language summary by The Gufo; the paper is the authors’ own text.

Key findings

  • PyTok is a new, pure-Python, object-oriented systems code that integrates plasma physics and engineering constraints for rapid fusion power plant design exploration.
  • A reference design point for ST-E1 was identified with a major radius of 5.0 m, aspect ratio between 1.9 and 2.3, and toroidal field between 3.25 and 5.25 T.
  • The same permanent power-core hardware is designed to function first as a pilot plant and later, after an in-vessel component upgrade, as a commercially competitive reactor.
  • The commercial-phase design targets steady-state operation with a capital cost of $12,000-15,000 per kWe, a fusion power of 2.0-2.5 GW, and a net electric output of 800-1000 MW.
Download Follow Updates